How a bathroom remodel goes, step by step
A full bathroom remodel usually runs in this order: planning and ordering, demolition, rough plumbing and electrical, inspection where a permit applies, waterproofing and tile, then the vanity, fixtures and glass, and a final walkthrough. A simple refresh is shorter. Moving the shower, toilet or walls, or finding damage behind the walls, makes it longer. Your contractor should give you an estimated completion date in writing.
Before work starts
Planning happens before anyone picks up a hammer. With Boheneck, you tell us the project and timeline, Jake calls you back, and then comes an in-home consultation and a detailed written estimate. We give an estimated completion date after the initial quote.
Use this time to choose tile, the vanity, the shower valve and trim, the toilet, the mirror and lighting, and any glass. Items that have to be ordered should arrive before demolition, so the bathroom is not left open while you wait.
A typical full remodel, step by step
This is a general example for a full remodel that keeps the same layout. It is not a promise for any one job: your bathroom, your choices and what is found behind the walls set the real schedule.
- Step 1: protection and demolition. Floors and the path through the house are covered. The old tub or shower, tile, vanity and toilet come out. This is when hidden water damage or old repairs show up, and anything found has to be fixed before new work covers it.
- Step 2: rough-in and inspection. Plumbing and electrical are moved or updated, and the exhaust fan is checked. When the work needs a permit, the inspector usually looks at this rough work before the walls are closed.
- Step 3: walls, waterproofing and tile. New backer board goes up, the shower is waterproofed, and tile is set and grouted. Tile is often the longest stretch, especially with a custom shower, a niche or a detailed pattern.
- Step 4: vanity, fixtures and glass. The vanity, top, sink, faucet, toilet, lights and mirror go in. Custom shower glass is usually measured after the tile is done, so it can take a little longer to arrive.
- The end: punch list and walkthrough. Paint touch-ups, caulk and final adjustments, then a walkthrough with you.
What makes it take longer
- Moving the shower, tub, toilet or a wall, which means more plumbing and framing.
- Hidden damage found during demolition.
- Waiting on a permit or an inspection.
- Special-order tile, fixtures or glass that arrive late.
- Changes made after work has started.
With us, any change is discussed and documented, and we give you updated pricing and timelines.
If it is your only bathroom
Tell us early. In many cases you can stay in your home during a remodel, though it depends on the scope, and we’ll work with you to keep disruption down. Our bathroom jobs include permits, floor protection, daily cleanup and a final walkthrough.
See real ones
Our bathroom before and after page shows real Boheneck jobs, including a garden tub and stall shower replaced with a walk-in glass shower.