What to expect during a kitchen remodel

Most kitchen remodels follow the same path: a consultation and written estimate, choosing cabinets, countertops and fixtures, then demolition, rough plumbing and electrical, inspections where permits apply, drywall, cabinets, countertops, backsplash, and a final walkthrough. Expect to be without a working kitchen for part of the job, so plan a simple stand-in kitchen elsewhere in the house.

Before any work starts

With Boheneck, it starts with a short request: you tell us the project and timeline, and Jake calls you back. Next is an in-home consultation, then a detailed written estimate. We give an estimated completion date after the initial quote.

This is also when you make most of your choices: cabinets, countertops, sink and faucet, lighting, tile, and appliances. Decide early. Cabinets and some other items are often ordered weeks ahead, and a late change to a cabinet size or appliance can push back everything after it.

If you live in a community with an HOA, check its rules now. The Arizona Registrar of Contractors says homeowners are responsible for telling the contractor about HOA restrictions before the contract is signed.

The stages, in order

  • Protection and demolition. Floors and nearby rooms get covered, then old cabinets, counters and finishes come out. Our kitchen jobs include floor protection and daily cleanup.
  • Surprises behind the walls. Demolition is when hidden damage, such as an old leak, shows up. Damage that is found has to be fixed before new work covers it.
  • Rough-in. Plumbing, electrical and any ductwork are moved or updated. With Boheneck, plumbing, electrical and HVAC are handled by licensed subcontractors we coordinate.
  • Inspections. When the work needs a permit, the inspector usually checks the rough work before the walls are closed. Permits are included in our kitchen jobs.
  • Walls, then cabinets. Drywall is patched or replaced and the room is painted or primed. Cabinets go in next.
  • Countertops. Stone and quartz tops are usually measured after the cabinets are in place, then cut and installed, which can leave a short gap with no counters.
  • Finishes. Backsplash, sink, faucet, lighting, hardware and appliances.
  • Final walkthrough. You walk the kitchen with us and note anything that still needs attention.

Living through it

In many cases you can stay in your home during a remodel, though it depends on the scope. A few things make the kitchen part easier:

  • Set up a stand-in kitchen in another room with the fridge, a microwave, a coffee maker and a bin of dishes.
  • Plan simple meals and use the bathroom or laundry sink for washing up.
  • Expect noise and some dust during demolition and drywall, even with floors covered.
  • Keep pets and kids out of the work area.

If you change your mind mid-job

Changes happen. With us, any change is discussed and documented, and we give you updated pricing and timelines. The Arizona Registrar of Contractors also advises that a change order should say how it affects the cost and the completion date, and be signed by both you and the contractor.